ISO 9001 certified. IPC-A-610 workmanship. Functional test on 100% of units unless your specification says otherwise.
Material verified against BOM on receipt: part number, quantity, packaging integrity, moisture indicators. Consigned material is inspected and any shortage or damage reported before assembly starts.
The first assembled board of every run is checked against the drawing before production continues. Any deviation stops the line.
Solder paste volume checked at print start. Placement verified after setup. Reflow profile recorded per run.
Visual inspection to IPC-A-610, AOI where specified, then functional test with a fixture built for your board. Failures are logged by symptom, not just counted.
The stations behind the four stages above.
Some of this is technical, some is commercial. Being clear about both saves us a wasted month.
We send bare boards and assembled samples before you commit to volume.
Request a sample