Home / Quality Control

Quality control — tested every lot, not sampled

ISO 9001 certified. IPC-A-610 workmanship. Functional test on 100% of units unless your specification says otherwise.

Where we check

STAGE 01

Incoming inspection

Material verified against BOM on receipt: part number, quantity, packaging integrity, moisture indicators. Consigned material is inspected and any shortage or damage reported before assembly starts.

STAGE 02

First article

The first assembled board of every run is checked against the drawing before production continues. Any deviation stops the line.

STAGE 03

In-process

Solder paste volume checked at print start. Placement verified after setup. Reflow profile recorded per run.

STAGE 04

Final test

Visual inspection to IPC-A-610, AOI where specified, then functional test with a fixture built for your board. Failures are logged by symptom, not just counted.

Inspection, as it actually looks

The stations behind the four stages above.

AOI optical inspection machine checking a completed circuit board assembly
AOI inspection Optical check on lots where your specification calls for it
Precision measuring instrument used for dimensional checks
Dimensional check Thickness and flatness measured, not eyeballed
Close-up of an assembled control board before final inspection
Final look Visual inspection to IPC-A-610 on every unit

Documentation we ship with the goods

If your market needs UL or ETL, tell us at quotation stage. Our boards are built to support the certification process, but the certificate is held by the brand owner — we supply the technical file, not the listing.

Where we draw the line

Some of this is technical, some is commercial. Being clear about both saves us a wasted month.

  • BGA, HDI, 0.4 mm pitch and below — sister plant only
  • Flex and rigid-flex circuits — sister plant only
  • Boards above 4 layers, except case-by-case
  • Assuming responsibility for customer-supplied defective components
  • Certifying a finished appliance on the customer's behalf
  • Promising lead times we cannot hold in peak season

Need a pre-production sample to test?

We send bare boards and assembled samples before you commit to volume.

Request a sample
💬 WhatsApp