Home / About Us

A PCBA factory in Yuyao, Ningbo — small enough to answer, equipped enough to deliver

Ningbo Carfit Electronics Co., Ltd. builds printed circuit board assemblies for brands, importers and second-source programmes. Own plant, three SMT lines, ISO 9001 and CE.

What we actually do

We are a contract manufacturer. We do not sell components, we do not broker boards from other factories, and we do not pretend to build things outside our range.

  • SMT assembly on three lines, single and double-sided FR-4
  • Through-hole insertion and wave soldering
  • Functional test fixtures designed and built in-house
  • Component sourcing (turnkey) or assembly-only (consigned)
  • Five control board families designed in-house and in mass production
Our customers are usually small and mid-sized. Brands launching their first product, importers adding a private label, and companies that already have a supplier but want a second one they have actually qualified.
CompanyNingbo Carfit Electronics Co., Ltd.
LocationYuyao, Ningbo, Zhejiang, China
AddressNo. 9 Dongwan, Huitou Village, Zhangting Town, Yuyao, Ningbo, Zhejiang, China
SMT lines3
AssemblySMT + THT / wave soldering
CertificationISO 9001 · CE
WorkmanshipIPC-A-610
TestVisual, AOI, functional test
ContactFrank · Sales Manager
Alex · Sales
Phone / WhatsApp+86 134 5624 1375
+86 183 6743 4985
Emailhujunhuichina@gmail.com
nbrelay@outlook.com

Shop floor

Photographs of the lines, the inspection station and the engineering bench — the same floor your order runs on, not a stock image.

SMT assembly lines at the Ningbo Carfit Electronics plant in Yuyao
SMT linesThree lines, single and double-sided FR-4
AOI optical inspection machine checking circuit board assemblies
AOI stationOptical inspection on every lot
Engineering bench where a technician assembles and tests a PCB
Bench and testFixtures built and maintained in-house

How we prefer to work

Small batches are welcome

Pilot runs from 500 pieces. A first order that is too small for a large EMS is a normal order for us.

Deadlines get answered, not ignored

Samples in 2–3 weeks as standard, 7–10 days when you are up against a launch date — quoted at a premium, stated openly.

Bad news comes early

If a board is outside our range, or a lead time is not achievable, you hear it in the first reply rather than the fifth week.

Visit the factory, or start with a sample.

We are in Yuyao, Ningbo — under an hour from Ningbo Lishe airport. Video walkthrough available any time.

Get in touch
💬 WhatsApp